SuedLink
SuedLink was awarded to Prysmian Group by German transmission grid operators TransnetBW GmbH and TenneT TSO GmbH with the assignment to design, manufacture, supply, lay, joint, test and commission a 2 GW ±525 kV HVDC underground cable system on a route of 580 km, from Wilster in Schleswig-Holstein to the southern connection point at Bergrheinfeld, Bavaria.