SuedOstLink
SuedOstLink was awarded to Prysmian Group by German grid operator TenneT TSO GmbH with the assignment to deliver two ±525 kV HVDC underground cable systems, with transmittable power of 2 GW each, over a route of 270 km starting at the Southern Germany connection point at Isar, close to Landshut in Bavaria.