Projects Division

Do you want to take part in the energy transition? Our Projects Division can be your next career opportunity!

We are hiring for professionals who want to challenge themselves through global impactful projects.

Since 2007 Prysmian’s Projects Division has worked on Supply Only and Turnkey Projects, designing, manufacturing, building, trading cables and components especially for the energy transmission for the major national and international operators. It is an EPC (Engineering, Procurement, Construction) Contractor, so its teams follow each phase from the very beginning to its end.

GOALS

Together with the other Prysmian Group entities, the Projects Division works on clear goals, built on 3 key pillars:

Our commitment to valuing inclusion and gender equality.

Projects Division takes seriously into account the commitment that Prysmian, through Social Ambition | Prysmian Group, supports in pursuing the United Nations Sustainable Development Goals which aim at promoting strategies that build economic growth and address a range of social needs including education, health, social protection, and job opportunities, while tackling climate change and environmental protection.

In this scenario, particular importance is assigned to the objectives that point at recognizing the need for diversity, inclusion and gender equality at all levels; Projects Division is committed to empowering more women to pursue careers with Prysmian in technical and scientific roles.

An example is Katerina Schmid’s experience: A female leadership success story in logistics | Prysmian Group

Prysmian Group Logistics expert Kateryna Schmid is responsible for the delivery and interim storage as well as later delivery to the construction site of 470 km of underground cables for the Nothern part of SuedLink project, which is crucial for Germany’s successful energy transition. She joined Prysmian in 2020, moving to Würzburg, where Prysmian had set up one of the three project offices needed for the job (the other two are in Bayreuth and Wuppertal).

Kateryna persevered, acquired the necessary expertise and constantly improved her skills. After successfully completing that project, she sought out new challenges, and found exactly what she was looking for at Prysmian.

 

"I think it's great to own a central function in the project as a knowledge carrier. The daily exchange with so many partners involved is an exciting challenge. The technical topics also excite me. I'm constantly improving my knowledge about how the cables are created and how they are further developed,” Kateryna said

The voice of our female professionals

Prysmian Group has been actively engaged in several initiatives that prioritized Diversity, Equity & Inclusion, striving to create a supportive environment for employees to balance their personal and professional lives.

Give voice to some of the women who work in Projects Division: women with a high seniority and women who have recently joined the Company, mothers, women in career who have reached a position making space in the male universe, professionals who, thanks to their consolidated skills, have been able to combine Company's objectives and personal ones.

GIADA CASSINI

I joined Prysmian in the role of Project Director for the Suedlink, one of the German Corridors projects, among the most strategic projects in our Company.

Clearly, the decision to assign such responsibility to a woman implies the absence of genre prejudices, and rather, instead, opening and trust, which is natural for a company like Prysmian, counting, among other excellences, the general recognition of a sustainability role model, seen as an example for other operators in the energy business.

It often occurs, in fact, while discussing about Prysmian projects in international contexts, to raise a genuine interest for Prysmian commitments supporting STEM initiatives for women graduates and professionals, as published in internal and in public events, and I can say those initiatives are perceived as references.

I would like to add another element I am very proud of, as a Project responsible: the presence in the team of known and established women engineers including the Research and Development environment, a field which was traditionally retained “masculine”. And this is an increasing trend.

I believe this particular attention to prize and reward professionality independently from the genre, thanks to a long term vision, is the basis for a fair and effective resource development.

ELISA PICCOLI

From the first interviews at Prysmian PowerLink, I immediately had the impression that the real company intent was to probe the candidate's skills and competences, nothing else.

Impression confirmed at the time of hiring where I found myself in a team made by only men:  this ever was (is) a problem.

My commitment was soon enhanced since, within a few months, I was offered a position of responsibility, in which my reports are men.

Satisfactions and economic awards are totally independent of the fact that I am a woman and young: the motivation towards personal growth is assured to every employee who is committed and who constitutes a resource for the company.

The world of cables may seem reserved for male personnel, but my experience let me assure you that this is not the case!

FRANCESCA RIPEPI

I hold the position of Portfolio Contract Manager at Prysmian PowerLink. It is indeed part of the “industrial world”, it should by no means be exclusively associated with a male domain. Thanks to Prysmian's STEM policies and the multidisciplinary nature that characterizes the company, various roles are filled by professionals from diverse backgrounds. For instance, my team is exceptionally diverse in terms of gender, origin, skills, geographic location, and more. I am delighted to affirm that this diversity truly reflects Prysmian's culture, which regards diversity as a valuable asset.

One might think that the world of cables isn't interesting, but in reality, working at Prysmian means having the opportunity to contribute to projects of significant impact. Of course, we conduct business, but we do so sustainably and its impact extends well beyond the pure cable industry going into the realm of energy transition for a more sustainable world for future generations.

In this regard, I recently became a mother, and Prysmian's family-friendly policies and the new Parental policy have been instrumental in making this experience more manageable. Balancing parenthood with a demanding career is undeniably challenging, but I hope that these two aspects can increasingly coexist harmoniously!

Discover more about Prysmian's commitment on promoting these issues by taking a look at the following links:

 

Social Ambition 2030 | Prysmiangroup Intranet

Diversity, Equity & Inclusion | Prysmiangroup Intranet

WOMEN IN STEM | Prysmian Group

 

Have a look at some of our projects

German Corridors

 

Three underground energy cable systems connect German wind farms in the North Sea to the southern states of Bavaria and Baden-Württemberg. This is the energy project that will lead Germany to have 65 % of its electricity consumed from renewable sources by 2030.

Of these systems, Prysmian will lay about 2,300 kilometers of energy cables, which are required for the three German corridor projects.

These will include the use of the P-Laser 525 kV cable, the first 100% recyclable, environmentally sustainable and high-performance cable.

Discover our HVDC German Transmission Projects

Tyrrhenian Link

 

The Tyrrhenian Link project involves the design, supply, and installation of more than 1,500 km of submarine cables to support energy exchange between Sardinia, Sicily, and Campania, thereby strengthening the Mediterranean energy hub.

The submarine and land cables will be produced at the Arco Felice (Naples) plant and the cable laying will be largely carried out by the Leonardo da Vinci, the world's largest cable laying vessel. Noteworthy is the fact that Tyrrhenian will set a record for submarine cable installation in terms of depth. The estimated level is approximately 2250 meters b.s.l.

Sofia Project

 

This is a project to build a turnkey high-voltage subsea and onshore cable system for the Sofia offshore wind farm; it’s signed by RWE Renewables, one of the world's largest developers of offshore wind farms.

The Projects Division will be responsible for the design, supply, installation and testing of a symmetrical single-core high voltage direct current (HVDC) cable system that will connect the offshore substation to the onshore conversion station in Teesside. The project includes more than 440 km of ±320 kV submarine cables with XLPE insulation, installed via the Leonardo Da Vinci, and 15 km of ±320 kV land-based cables with P-Laser insulation.

Hear the voices of our people

“We are in the middle of the energy transition and we are growing everyday more, especially in the Projects Division. To accommodate this growth, we invest a lot in diversity, such as cultural diversity and gender diversity. I believe that this is also strengthening our team.”

Hakan Ozmen, Projects Division Executive VP

“Since I have taken this role I have learned a lot. I think that working for strategic Turnkey Projects is exiting and allows to learn very fast about different area of our business. I am very proud of being part of the Division Projects and I am enthusiastic about next challenges to come.”

Elisa Marrali - France & Belgium Submarine Power Sales Manager – Projects Division

“The large founding initiatives happening all around the world are marking a great opportunity for the Projects Division. So, more than ever, we are now investing in plants, research and especially people. Everyone who wants to take this challenge can find the place where to better express his/her talent and to contribute to the target we have.”

Marco Marelli Projects System Engineering VP - Projects Division

“As contract manager, we assist the project teams. Working on a project is very exciting. Projects Division means teamwork and effort, with its challenges and rewards. But it is very rewarding to see how your work somehow helps to create something important that impacts the necessary energy transition.”

Elena Vazquez Roman - Contract Manager - Projects Division

“Within a “project environment” you have the chance to tackle new challenges, different situations, perspective and multiple stakeholders. It is a privilege to be part of a talented and committed team, working for a Company where I feel I can contribute to a more sustainable world.”

Ripepi Francesca - Portfolio Contract Manager - Projects Division

“Intercultural cooperation is key to master the increasingly complexity in work processes. A good international teamwork is more than the sum of individual performances. This is what you find in the Projects Division. Every day, we benefit from connections among individuals and areas within our division.”

Heiko Dirks - Continental Europe Regional Director for Project Management – Projects Division

Typical available positions in the division

The Project Manager is the main interface with the Customer and Customer Project Team. Project Manager has the responsibility to initiate, plan, execute, finalise and monitor & control the project in accordance with the customer’s contractual terms and specification, within the agreed timescales and budget, this includes coordinating the project team as well as any third-party contractors or consultants. PM is also responsible for defining clear project objectives, building the project requirements and managing the constraints in terms of costs, time, scope and quality.

The Jointing superintendent supervises directly multiple teams of jointers working on specific sites, offshore and onshore. The figure acts as interface with Customer, jointing subcontractors, cable laying subcontractors and other third parties involved in the site works for jointing-related aspects and planning of the activities. He/her provides method statements and other documentation necessary to carry out the works on site in cooperation with and under the supervision of Installation Engineering, supervises multiple teams of jointers working on specific sites to install timely with the best quality standards all the accessories required by the contracts. Provide the activities optimizing resources and tools assigned to the specific sites of accessories installation. Performs site supervision taking care of resources (personnel and assets), technical aspects, logistic and HSE management on site. Supervises helpers (subcontracted) on site as required. Guarantees the compliance with internal rules and procedures during the entire process. Performs and supervises the activities of the sheath testing on the cables, as required.

The System Design Engineer offers technical solutions related to the AC/DC Land and Submarine Cables Systems (Cables and Accessories). The figure designs a competitive technical solution for the specific application, provides Design reports including Electrical, Thermal and Mechanical verifications of the cables, identifies testing and qualification requirements and needs. Analyze and identify the technology readiness and Risk Assessment of the products, updates design reports based on as-built conditions. Contributes to identification of Root Cause Analysis in case of Non-Conformities or faults. The Current Prysmian Cable Technologies are AC/DC/XLPE/Plaser/HV/MV). Cables accessories: joints, terminations, link boxes

The installation Tender Engineer offers technical solutions related to the marine and land installation phase of cables and accessories. The main responsibilities are the following, prepares Installation Technical Solution and Method Statement for Installation. Manage the Installation Preparedness Plan (Installation section), support in evaluating/developing best/new Installation solution. Analyze the installation Costs and support to suggest potential investments (for Installation).

Responsible for the planning and implementation of the Project Quality assurance activities. Coordinates the Quality Control activities implementation. He/her is responsible for Quality aspects during project delivery phase. The figure supports the Project Managers in the review and management with Customers about Quality matters. Prepares the Project Quality Plans, Quality Control Plans and Project Quality Procedures which guarantee compliance with contractual requirements and Quality Company Procedure. Performs Quality Induction activities within the various area of the Project. Supports the handover phase from bid to delivery phase by creating a link between project team and PPL Plants. Defines Plan and execute Project Audits. Supervises the proper execution of the Quality Control Plan. Assesses the Quality Control Plans of sub-contractors and identifies any necessary corrective measures. Provides periodical analysis of project Non-Conformities, complaints, KPIs and lesson learnt. Overall responsible for the management of the project Non-Conformities.

Discover on our portal all the available opportunities in the Projects Division:

And Join our energy transition journey.